A Vietnamese cosplayer poses as police officer character from the game during the League of Legends (LOL) Mid-Season Invitational 2019 play-in group stage, in GG Stadium, Ho Chi Minh, Vietnam May 5, 2019. (Photo by Reuters/Kham)
Two hippopotamus are fed with pumpkins at the Hanoi Zoo, in Hanoi, Vietnam, 25 October 2018. The zoo has been the home for more than 800 animals of over 90 different species, including three hippopotamus, since it was built in 1976. (Photo by Luong Thai Linh/EPA/EFE)
Couples take part in the “Love and Challenge Marathon” in Hanoi, Vietnam, 16 August 2015. Fifty couples, who are going to get married, participated in the event which is held the fifth time. This year, the winners of the marathon received a honeymoon trip to Malaysia. (Photo by Luong Thai Linh/EPA)
Vietnam’s Son Doong cave, the largest in the world, could hold a 40-story skyscraper inside. The pristine ecosystem has its own river and jungle. Despite its size, Son Doong wasn’t discovered until 1991. It was lost again for nearly two decades and was fully explored for the first time in 2009. (Photo by Jason Speth/HuffPost)
A pupil of the Dao ethnic tribe returns home from school along a hillside path at Suoi Thau village in Hoang Su Phi district of Vietnam's northern province of Ha Giang, located at the border with China, September 18, 2015. (Photo by Reuters/Kham)
A Vietnamese woman, wearing the traditional “ao dai” long dress, poses for photos along peach blossom flowers ahead of the Vietnamese “Tet” (Lunar New Year festival), in a field in Hanoi, Vietnam, February 2, 2016. (Photo by Reuters/Kham)
The Dragon Bridge (Vietnamese: Cầu Rồng) is a bridge over the River Hàn at Da Nang, Vietnam. Construction of the bridge began on 19 July 2009 (the same day as the inauguration of the nearby Thuận Phước Bridge) when the Prime Minister of Vietnam Nguyen Tan Dung and many high-ranking government officials attended the groundbreaking ceremony. Dragon Bridge is 666m long, 37.5m wide and has six lanes for traffic. It opened to traffic on March 29, 2013, at a cost os nearly VND 1.5 trillion dong (US$88m). The bridge was designed by the US-based Ammann & Whitney Consulting Engineers with Louis Berger Group. Construction was undertaken by Company No. 508, an affiliate of Civil Construction Engineering Corporation No.5, and Bridge Company No. 75.