Loading...
Done


Over 60 minutes of relaxing, piano music to sleep and study!

Details
12 Jun 2015 08:12:00


2 Hours Music For Meditation and Relaxation Part 3.

Details
22 Jun 2015 15:12:00
Central Palo Seco power station of the Puerto Rico Electric Power Authority (PREPA) is seen behind a cemetery, in San Juan, Puerto Rico January 22, 2018. (Photo by Alvin Baez/Reuters)

Central Palo Seco power station of the Puerto Rico Electric Power Authority (PREPA) is seen behind a cemetery, in San Juan, Puerto Rico on January 22, 2018. (Photo by Alvin Baez/Reuters)
Details
06 Dec 2018 00:01:00


To mark World Water Day, on March 22nd Solidarités International and its agency BDDP Unlimited will roll out a campaign to build awareness of the scourge of undrinkable water.
Details
08 Mar 2013 10:25:00


March of the Soviet Artillery (1943): Video – circa 1936-1947



Details
17 Jan 2014 15:02:00


In a world first, a dog drives a car completely by himself on a racetrack in New Zealand. The dog, named Monty, has trained for more than two months to drive the modified car in a project aimed at increasing pet adoption from animal shelters. The giant schnauzer drives the Mini 70 metres and even changes gears
Details
13 Dec 2012 12:17:00
A general view shows the Krasnoyarsk hydro-electric power station on the Yenisei River near the Siberian city of Krasnoyarsk, Russia, January 13, 2016. The power plant, owned by EuroSibEnergo company, part of En+ Group, with a generating capacity of 6,000 megawatt (MW), has a ferro-concrete dam 124-metres high and 1065-metres long and is the second largest Russian hydroelectric power station. About 85% of the energy generated is intended for the Rusal Krasnoyarsk aluminium smelter, according to representatives of the power station. (Photo by Ilya Naymushin/Reuters)

A general view shows the Krasnoyarsk hydro-electric power station on the Yenisei River near the Siberian city of Krasnoyarsk, Russia, January 13, 2016. The power plant, owned by EuroSibEnergo company, part of En+ Group, with a generating capacity of 6,000 megawatt (MW), has a ferro-concrete dam 124-metres high and 1065-metres long and is the second largest Russian hydroelectric power station. About 85% of the energy generated is intended for the Rusal Krasnoyarsk aluminium smelter, according to representatives of the power station. (Photo by Ilya Naymushin/Reuters)
Details
16 Jan 2016 08:03:00


This Strange Russian Cartoon Shows Mario's Nasty Side and bogatyr or vityaz is a stock character in medieval East Slavic legends (byliny), akin to a Western European knight-errant.
Details
04 Apr 2014 23:59:00